Mastering the Relocation of Production Lines: Challenges and Solutions

Relocation of production lines involves much more than just moving machinery. While it might appear to be a straightforward logistical task, it encompasses a range of challenges that require significant resources and time. Often, it necessitates not only the transfer of existing infrastructure but also its adaptation or even redesigning certain technological processes.

Relocation of Production Lines: New Location, New Technological Challenges

A new location often demands more than just adapting existing equipment. The space to which a production line is relocated rarely mirrors the previous one. Differences may include room layout, availability of technical utilities, ventilation system requirements, or electrical load specifications. What seems like a simple operation can transform into a complex process requiring thorough analysis. It’s crucial to adjust equipment to the new environment and consider how spatial changes affect the entire technological chain—from power supply and safety to production efficiency.

In practice, this often means constructing new sections of technological chains to ensure smooth machine operation in the new location. Reconfiguring cable routes may be necessary, especially if the previous setup was tailored to specific conditions of a different facility. Changes might also involve power system configurations, including electrical distribution panels and pneumatic installations. Some equipment may need modifications to meet new safety or efficiency standards imposed by the new production space. All these aspects must be considered in relocation planning to avoid costly downtimes and unforeseen issues.

When Time Becomes the Enemy: Relocation in Three Days

What do you do when a client demands the relocation of a production line in just three days? Such scenarios, though extreme, are not uncommon in the industry. Sometimes, the urgency arises from a sudden need to change production locations, while other times it’s about minimizing downtime and associated financial losses. Regardless of the reason, executing such a task in a short timeframe requires precise planning, excellent organization, and full engineering support.

The key in these situations is to break down the work into stages. Instead of attempting to move the entire line at once, prioritize actions that allow for the quick startup of critical components, with the rest adjusted in a second phase. For instance, on the first day, focus on dismantling and transporting the most crucial machines essential for the production process. Meanwhile, an engineering team can work on adapting the new space, preparing the electrical and technical infrastructure to be ready for subsequent equipment.

Relocation of Production Lines: Precise Planning and Coordination as Keys to Success

In scenarios where only three days are allocated for the relocation of a production line, there is virtually no margin for error. Every stage must be planned with surgical precision. What does a well-planned relocation process entail? It means constant synchronization of actions, where all teams—from mechanics to automation specialists to electricians—are ready to respond immediately.

Planning involves not only the physical transfer of machines but also a comprehensive understanding of how each element of the technological line will function in the new location. Sometimes, a phased approach is necessary, where key machines are prioritized for startup, while adjustments to others occur concurrently with the production’s commencement. This reduces the risk of downtimes and provides flexibility in addressing unforeseen technical issues.

The experience of an industrial automation integrator is indispensable here—not just for machine assembly but for full process integration, ensuring minimal downtimes and maximum production flexibility in the new location. The challenge lies in knowing which solutions can be temporarily implemented and which must function immediately while maintaining production continuity.

Engineering Support, Safety, and Risk Analysis: The Foundation of Successful Relocation

Relocating a production line, especially within a short timeframe, requires not only precise planning but also the support of an experienced engineering team. This often means not just moving machinery but also designing new technological solutions tailored to the specifics of the new location. Support from a construction office and an industrial automation integrator is crucial, providing the necessary documentation and system adjustments to meet harmonized standards.

One of the most important elements of such a process is risk analysis in accordance with EN ISO 12100. At every stage—from dismantling to transport to assembly—it’s essential to thoroughly examine potential hazards and implement technical solutions that comply with regulations. Even temporary installations must be designed to eliminate additional risks, thereby meeting all safety requirements.

In practice, every engineering decision must be based on a reliable risk analysis. Employing appropriate safety systems and industrial automation, aligned with harmonized standards, minimizes accident risks and ensures compliance with current regulations. Whether solutions are temporary or permanent, safety and compliance must be priorities at every stage of relocation.

Recertification and CE Marking Post-Relocation of Production Lines

After completing the relocation of a production line, the process does not end with the machines’ restart. Often, recertification of the entire line is necessary to ensure that all changes comply with the Machinery Directive and other EU regulations. Particularly when new technological elements are introduced or existing systems are modified, the line must undergo a full conformity assessment process.

Conformity assessment includes risk analysis according to EN-ISO 12100, verification of all harmonized standards, and a complete review of the technical documentation. Only after this process can the production line be awarded the CE mark, confirming its compliance with EU requirements. It’s crucial that the recertification process is conducted by competent experts who ensure that all safety and technical compliance aspects are met.

Machine and production line certification post-relocation is not merely a formality—failure to conduct a proper conformity assessment after relocation can lead to severe legal consequences and safety hazards. Therefore, it’s vital to conclude the entire relocation process with full certification, confirming that the new line meets all necessary technical and safety requirements.

FAQ: Relocation of Production Lines

What are the stages of relocating a production line?

Relocation involves dismantling, transport, assembly, automation integration, and the line’s reactivation.

Does relocation require recertification of the production line?

Yes, most relocations require recertification to meet the Machinery Directive and harmonized standards.

How long does the relocation process take?

The duration depends on the project’s scale and technical conditions, but precise planning and coordination are key.

Does relocation include risk analysis?

Yes, risk analysis according to ISO 12100 is essential to ensure full safety and regulatory compliance.

Can you conduct a production line relocation in a short timeframe?

Yes, we offer support for projects with tight deadlines, ensuring compliance with safety requirements.